Planning and Managing the Schedule

Unlock the complete study guide + 1,040 practice questions across 16 full exams.

Bundled into the existing Project Management Professional premium course — no separate purchase.

14-day money-back guarantee — no questions asked.

Included in this chapter:

  • Build the schedule as a pipeline
  • Estimate the work before you sequence it
  • Sequence into a network and read the critical path
  • Compress a critical path that overruns
  • Schedule adaptively: fixed timeboxes, flexing scope
  • Baseline, then manage variance and coordinate dependencies
  • Exam-pattern recognition

Building the schedule: the same stages, predictive vs adaptive tools

Schedule stagePredictiveAdaptive
Estimate the workA duration per activity: analogous, parametric, or three-pointA relative size in story points per backlog item
Sequence into a networkOrder activities by their dependencies into a schedule network diagramOrder the backlog and pull items into fixed-length timeboxes
Find the critical pathThe longest path sets the finish and carries zero floatNo critical path; forecast the finish from remaining points and velocity
Compress if it overrunsCrash or fast-track activities on the critical pathHold the timebox and reduce or defer scope
Baseline, then manageApproved schedule baseline; measure variance against itRefresh the release forecast from actual velocity each iteration

Decision tree

YesNoYesNoNoYesYesNoNeed to pull thefinish date in?Manage tothe baselineIs the fix on thecritical path?Off the critical path:won't move the finishAdd resources tocritical activities?Crash(adds cost)Linked by discretionary(soft) logic only?Fast-track(rework risk)Reduce scopeor move the date

Cheat sheet

  • The critical path is the longest path and carries zero float
  • Total float measures how far an activity can slip
  • The work breakdown structure has no durations or critical path
  • Crashing adds cost; fast-tracking adds rework risk
  • Compress the critical path to shorten the project
  • Only discretionary (soft-logic) dependencies can be fast-tracked
  • Three-point estimating accounts for activity uncertainty
  • Parametric and analogous estimates rely on historical data
  • Story points estimate relative size, not hours
  • Velocity turns remaining points into a delivery forecast
  • Timeboxes are fixed in length; scope adjusts to fit
  • Sprint planning pulls what fits the timebox and commits to a sprint goal
  • The schedule baseline is the reference for variance analysis
  • Coordinate external and cross-project dependencies in the schedule

Unlock with Premium — includes all practice exams and the complete study guide.

References

  1. PMP Examination Content Outline (July 2026)
  2. Leveraging the New Practice Standard for Project Estimating Blog
  3. Agile project management with Scrum Blog
  4. Critical path method calculations: project schedule terminology Blog
  5. Moving from Work Breakdown Structure to a critical path schedule Blog
  6. Managing crashed and fast-tracked shorten-interval projects Blog
  7. The Scrum Guide (2020) Whitepaper
  8. Rolling wave approach to project management Blog